Page 28 - IEC Insights May-Jun20
P. 28
FEATURE
PASS & SEYMOUR INDUSTRIAL WIRING DEVICES
®
A SAFER PLANT
Griffin Completes FROM THE GROUND UP
Cleanroom Project for
Thermo Fisher Scientific PIN & SLEEVE DEVICES
W A proven leader in the electrical contracting
Wayne J. Griffin Electric, Inc.
business for more than four decades, Wayne J.
(Griffin Electric), a leading electrical
Griffin Electric, Inc. is headquartered in Holliston,
subcontractor throughout New
England and the Southeast, has
Alabama, Duluth, Georgia, Charlotte, North
completed the electrical installation Massachusetts, with regional offices in Pelham,
Carolina, and Raleigh-Durham, North Carolina.
work at Thermo Fisher Scientific, ENR (Engineering News-Record) ranked Griffin
Electric 25th in its 2019 listing of the top 50
Inc.’s new cleanroom facility in national electrical contractors and 1st in New
Lexington, Massachusetts. England for electrical contractors and specialty
contractors. The company employs nearly 1400
The 50,000-sf facility was renovated to accommodate individuals. For more information, please visit
the development, testing, and manufacture of viral www.waynejgriffinelectric.com.
vectors in order to treat patients suffering from rare
diseases. The in-house scientists, QC specialists, and ©2020 Legrand All Rights Reserved PA3251 03/2020
®
production teams are using GMP practices in the NSF CERTIFIED NONMETALLIC SAFETY SWITCHES
company’s state-of-the-art lab space to accelerate the
production of new drug therapies.
On-site, the Griffin Electric team was responsible for As a contractor, you need tough industrial wiring
providing temporary power during construction of devices that can be easily installed and perform without
the cleanroom. In addition to powering the facility, interruption or danger—day after day—in the harshest
Griffin supplied lighting services, including fixtures conditions. Explore our full suite of industrial products,
and controls, and set up the wiring for the tele/data built by a leader with over 125 years of experience with
systems. The Griffin team also installed additional electrical safety.
systems for fire alarm, clock, lightning protection,
and security within the facility. www.legrand.us
Skanska USA Building, Inc. of Boston served as the
®
project’s general contractor, working directly with STERIGUARD ANTIMICROBIAL DEVICES
architectural and electrical engineering firm DPS
Engineering of Framingham.
26 Insights Magazine | May/June 2020 | www.ieci.org
3/17/20 11:20 AM
PA3251-PS-IECad-Safety.indd 2 3/17/20 11:20 AM
PA3251-PS-IECad-Safety.indd 2