a contractor can reduce their material
                                     handling time by up to 40% when they
                                       collaborate with a single distributor







                                               a huge monetary impact on the end users.   #4: A SMARTER WAY TO
                                               Having materials stored locally at Graybar   MANAGE INVENTORY
                                               gave us more flexibility to schedule
                                               deliveries at a time that didn’t interrupt   With proper planning and coordination,
                                               their business.”                  Graybar can significantly improve your
                                                                                 project efficiency by making sure you have
                                                                                 the right parts, at the right time, in the
                                               #2: SPEED UP WIRE PULLS           right place.
                                               Traditional wire pulls use heavy reels,   Once you have the material you need on
                                               maneuvered by multiple people. Graybar’s   site, the Graybar mobile app makes it
                                               SmartReel® portable payout system can   easy to manage. Using the app, you and
                                               drastically reduce the labor required while   authorized members of your team can
                                               improving safety.
                                                                                 review existing orders, place new ones,
                                                                                 manage inventory and access reporting on
                                               Using SmartReels, one contractor was    material usage – all from a smartphone.
                                               able to complete wire pulls in 35 minutes –
                                               down from 3-4 hours. These faster pulls
                                               also required half the number of workers   #5: ALL OF THE ABOVE – OR
                                               to complete, allowing the contractor to   SOMETHING NEW
                                               redeploy those electricians to higher-
                                               value tasks.                      Every project is unique, and we have
                                                                                 found the best collaboration starts with
                                               “Between the hours we save per pull and   a conversation. To explore how we can
            Five Ways Graybar Can Save         the fewer employees needed, we can gain   help you boost your productivity and
            You Time on the Jobsite            almost one percent of the project back,”   profitability with tailored solutions, click
                                               the contractor says.              here to contact a Graybar representative.
            #1: PRE-JOB PLANNING
            Every jobsite has unique considerations –    #3: SIMPLIFY MATERIAL
            from storage space to traffic flow – and   HANDLING WITH CARTS AND CAGES   1   U.S. Department of Labor
            it’s important to plan logistics in advance.   When material is delivered in piles of boxes   2   Daneshgari, P. “Agile construction® for
                                                                                   the Electrical Contractor”. Jones and
                                               on pallets, electricians spend valuable time   Bartlett, 2010.
            Graybar can help you identify time-  unpacking and moving inventory around   3   Simonian, Lonny, et al. “Agile Procurement
            saving prefab opportunities, consolidate   the jobsite – as well as risking slips, trips   and its Role in Adding Value.” ELECTRI
            SKUs, schedule deliveries to improve   and falls on the leftover packaging.  International – The Foundation for
            efficiency and help you achieve closer                                 Electrical Construction, Inc., 2016.
            to zero waste. When one customer   Instead, Graybar can sort inventory into
            installed communications equipment   cages and carts on wheels, positioned within
            in a governmental facility, Graybar was   30 feet or 30 seconds of points of install.
            able to deliver materials outside of peak
            business hours to keep the project running   Material staging helps electricians work
            smoothly without disrupting operations.   more efficiently and safely. According
                                               to an internal Graybar study, carts can
            “In one location, there were concerns   eliminate over 80% of the packaging from
            about too much noise in a call center   a lighting fixture delivery, saving valuable
            area,” the customer says. “Another [part of   electricians’ time and reducing fall risks
            the] facility was operational 24/7. If there   from clutter.
            was downtime at either, it would result in