Page 26 - IEC Insights Nov-Dec21_WEB
P. 26

2021 IEC NATIONAL AWARDS                EXCELLENCE IN CONSTRUCTION AWARDS – COMMERCIAL



































             COMMERCIAL CONSTRUCTION CATEGORY C
             ENCORE ELECTRIC


             IEC Rocky Mountain

             US Olympic and Paralympic Museum










          The 2021 nominees: Central Electric for SAISD Irving Academy,   Encore Electric has been working on this project for more than five
          Encore Electric, Inc. for US Olympic and Paralympic Museum,   years and is grateful to be a part of the GE Johnson construction
          Enterprise Solutions for First Baptist Church, Titan Electric   team. It was a complicated and extremely detailed build, with a
          Georgia for Signature FBO/Elite project, Titan Electric Georgia   planned user experience like no other and features the latest in
          for Osprey, Weifield Contracting Group for Lakewood Data   technology and comforts, all with power and electricity provided
          Center Remodel Project.                             by the Encore Electric team. Encore Electric had a constant
                                                              presence on the site for more than 800 working days!
          With Pikes Peak – one of Colorado’s most iconic mountain
          peaks – as a backdrop, the world’s newest and soon to be most   Encore Electric was tasked with doing the electrical install and fire
          iconic museums, the US Olympic and Paralympic Museum is   alarm on the project. This included providing power throughout
          truly a sight to behold. The museum, standing tall in the middle   the facility and conduit rough in for most of the exhibits in the
          of downtown Colorado Springs, Colorado, is the culmination of   museum. This provided a big challenge for the Encore Electric
          five years of planning, fundraising and design. At 60,000 square   team, starting with the design work in preconstruction. Those
          feet, it is the only comprehensive Olympic and Paralympic   teams had to take the owner’s and general contractor’s vision
          museum in the United States. The US Olympic and Paralympic   for the project and design these systems sight unseen.
          Museum opened to the public in July 2020 and is expected to
          host more than 350,000 visitors annually while creating up to
          60 new, permanent jobs in the Colorado Springs area.






      24  Insights Magazine | November/December 2021  | www.ieci.org
   21   22   23   24   25   26   27   28   29   30   31