FEATURE
 A total fleet   on the jobsite was not the number of   that prevent the job from proceeding   MCAA and MCAA of Canada; contributed to



 platform to move   hours or the contract size, but within   according to plan, jobsite management   several research projects for the Electrical
                                                                                 Contracting Foundation, MCAA, the New
                                               and supervision have a greater
            the direct control of the supervision
                                                                                 Horizons Foundation, and the National
            and management of the jobsite. The
                                               opportunity to control the fluid dynamics
                                                                                 Association of Wholesaler-Distributors. She
            number of safety incidents was found
                                               of their jobsite, which reduces the risks
 your business   to be directly related to the visibility   associated with the unknowns that   holds a Ph.D. in Construction Management,
                                                                                 Michigan State University. Additionally she
                                               allow unexpected incidents to occur.
            of the jobsite through the use of Agile
                                                                                 holds an MBA, University of Michigan-Flint,
            Construction® tools and to the overall
                                                                                 and a B.S.E. in Industrial and Operations
            jobsite productivity. The more productive
 forward.   your job is, the safer your job is.  Dr. Perry Daneshgari is the President /   Engineering, University of Michigan, Ann
                                                                                 Arbor. She specializes in process design
                                               CEO of MCA Inc. MCA Inc is a research and
                                                                                 and operations research. Heather was
                                               implementation company that focuses
            The results of this study, as shown in
                                                                                 a contributor for the ASTM Standard
                                               on implementing process and product
            Figure 3, shows that jobs that were
            visibly tracking their productivity, and   development, waste reduction and   E2691 “Job Productivity Measurement”
                                                                                 and also was co-author of the published
            were operating at a level that was on   productivity improvement of labor, project   ASTM book “Application of ASTM E2691
                                               management, estimation, accounting
            par or better than planned in terms of   and customer care. MCA, Inc. has worked   Standard Practice for Job Productivity
            productivity, had fewer than half the   with various national and international   Measurement in Agile Construction .” Dr.
                                                                                                          ®
            incidents per $10 million of contract value   companies all over the globe. Dr. Perry   Heather has also recently coauthored 3
 Connect your vehicle, worker,  job   than jobs that were either not tracking   has taught several classes and conducted   books for ELECTRI International, Books
 and asset data all on one screen.  productivity at all, or were tracking   several presentations for MCAA, MCAA of   1, 2 and 3 on the Industrialization of
            it but were not able to maintain their
                                                                                 Construction  and the future of the industry.
                                                                                          ®
                                               Canada, the Electrical Contracting industry,
            initial estimated level of productivity.  NWCCC and was keynote speaker at the   Heather has experience working with the
                                               2009 annual IEC National Convention.   construction industry, and currently works
            Different types of work do have different   Dr. Perry has completed over 12 research   with contractors and distributors across
            levels of risk, but the results are still the   projects for construction and distribution   the country on process improvement and
            same. Figure 4 shows the same story   industries and as well as published several   productivity measurement.
            across multiple divisions of a company   papers and articles. He has published a
            performing different types of work   handful of books, most recently: Books 1,   James Ford currently is MCA’s Lead Data
            in each division. In this comparison   2 and 3 for ELECTRI International on the   Analyst. Jim’s educational experience
            based on field hours instead of project   Industrialization of Construction  and   includes a Masters in Accounting from
                                                                     ®
            revenue, the result does not change:   the future of the industry. Dr. Perry has   Oakland University, and a BBA from the
 Mike Johnson  productive jobs have significantly fewer   also published an ASTM Standard for Job   University of Michigan with concentrations
 2 miles away  safety incidents across the board.  Productivity Measurement. MCA, Inc.’s   in Accounting, Finance, & Marketing. Jim
 Safety                                        experience is available and applicable to   leads the financial analysis and project
 70  70 out of 100  2  This tells us that most accidents or   companies of all sizes and industries.   audits for the field; raising awareness of
 Trending up  incidents are not random occurrences.                              how to reduce unknowns and uncertainties
 Oil Change  They are a product of management or   Dr. Heather Moore is Vice President of   in the early stages of a project before it is
 21 miles to go  lack of management on the jobsite. By   Operations for MCA Inc and has taught   too late. His prior work experience includes
            planning the job and identifying issues   numerous classes for NECA, IBEW, IEC,   13 years as a low voltage subcontractor.
             FIGURE 3                                       FIGURE 4















 Visit verizonconnect.com or call 866.844.2235
 for a fleet management consultation.
 ©2018 Verizon. All rights reserved.
                                                                         www.ieci.org  |  May/June 2019  |  Insights Magazine  29
   26   27   28   29   30   31   32   33   34   35   36